Current site status has been updated observations on 11/4/2024 8:15 p.m. Collapse/Expand
Current site observations on November 4th 2024 indicate that the hopedale side has been updated to cellular service by a local company extra buildings have been built on the site the original building appears to be intact
and locked with new locks
The tower is illuminated at the very top with a white flashing light strobe type there appeared to be sounds of ventilation equipment running in the buildings so all of them appear to have power